    Lots 64-73 slabs poured and frames up
   
   
    Lots 84-95 In-ground works and slab preparation
   
   
    Lots 64-73 slabs poured and frames up - aerial
   
   
    Lots 64-73 First floor joists installed
   
   
    Lots 56-59 Slabs prepared
   
   
    Lots 64-73 Steelwork and ground floor frames complete
   
   
    Lots 64-73 First floor joist installed
   
   
    Lots 64-73  - 50 per cent steel frames complete
   
   
    Lots 74-83  - Slabs nearly ready to be poured
   
   
    Lots 96-104  - Slabs preparation commenced
   
   
    Lots 84-95  - Slabs poured
   
   
    Lots 84-95  - Slabs complete