Lots 64-73 slabs poured and frames up
Lots 84-95 In-ground works and slab preparation
Lots 64-73 slabs poured and frames up - aerial
Lots 64-73 First floor joists installed
Lots 56-59 Slabs prepared
Lots 64-73 Steelwork and ground floor frames complete
Lots 64-73 First floor joist installed
Lots 64-73 - 50 per cent steel frames complete
Lots 74-83 - Slabs nearly ready to be poured
Lots 96-104 - Slabs preparation commenced
Lots 84-95 - Slabs poured
Lots 84-95 - Slabs complete